Your whole territory, live in the browser.

Distance, proximity, and territory bands.
Drop in a ZIP and see everything in range, ranked by distance and drawn into clean territory bands. It is the same engine you own offline, now with a live map underneath it so the numbers actually have a shape.
Live maps
Group accounts the way you actually sell.
Cut your book into segments by size, type, or distance, and watch each group light up on the map instead of hiding in a spreadsheet column. The cuts you make by feel finally have the map to back them.
Live segments
Score every account, call the right ones first.
Weight the factors that matter to you and let the scorecard rank the whole list, so your day opens with the highest-value stops instead of whatever happens to be closest. Priority beats proximity when the map is doing the sorting.
Scorecard
Draw territories that make sense.
Build balanced territories by hand or by rule and watch the counts and coverage update live as you go. No more finding out a patch was unworkable three weeks into carrying it.
Live territory
See the gaps before your manager does.
Analyze coverage across the whole territory, surface the white space and the overlap, and walk into the review with the map already telling the story for you. It is the difference between explaining your territory and showing it.
Coverage analysis
Same tools. Maps, charts, and live features added.
Five hosted tools. Individual or suite.
Distance Engine
ZIP proximity with interactive map output. Visualize proximity bands in real time.
View DetailsCustomer Segmentation
Segmentation with live charts showing distribution across your account tiers.
View DetailsAccount Prioritization
Prioritization scorecard with visual rank charts and exportable priority maps.
View DetailsSales Territory Builder
Territory building with live Leaflet map rendering and boundary visualization.
View DetailsTerritory Analyzer
ZIP-level territory analysis with interactive coverage maps and band charts.
View DetailsOne engine, more places to point it.
ProxiField is the hosted half of the Field family. When you need more than territory, the same proximity engine runs underneath every other line: ProxiField for the offline tools you own outright, ProxiMed for healthcare territory on live federal data, ProxiMatch for cleaning the messy account lists you feed all of it. New here? Sign in once you have a plan, or start with the free Offline Suite.

